Physical Status

TThe work of 400 kV D/C Dhalkebar – Bittamod Transmission Line was commissioned on 19th February 2016. The line was dedicated to the nations jointly by the Prime Ministers of Nepal and India on 20th February 2016.

Availability of Line

The transmission line is operating with very healthy availability of about _____%. The month wise availability is as under;

Financials