What's New

Power Transmission Company of Nepal Limited

Power Transmission Company of Nepal Limited (PTCN) is the JV Company of Nepal Electricity Authority (NEA), Powergrid Corporation of India Limited (PGCIL), Hydroelectricity Investment and Development Company Limited (HIDCL) and IL&FS Energy Development Company Limited (IEDCL). It has constructed and commissioned 400 kV D/C twin moose from Bittamod (near Sursand in India) to Dhalkebar of 42.10 Kms length (Nepal portion of Indo-Nepal inter-connection i.e. 400 kV D/C Muzaffarpur – Dhalkebar transmission line to be initially charged at 220 kV level) in the district of Mohatari and Dhanusha of Nepal. This line will established synchronous inter-connection of Indian and Nepalese electrical grids so as to facilitate import / export power between India and Nepal. The transmission line has been completed and commissioned on February 19, 2016. The line was dedicated to the nations on February 20, 2016 by the Prime Ministers of Nepal and India.

project

  • Indo-Nepal Cross Border Transmission Line

    Project Overview

    The transmission line consists of 85.55 kms of 400 kV D/C transmission line from Muzaffarpur (Bihar) to Sursand (Nepal Border) and extension of two nos. of 200 kV bays at 400/220 kV Muzaffapur s/s for termination of 400 kV D/C Muzaffarpur – Dhalkebar (Nepal) transmission line. The transmission line includes OPGW for c

  • Muzaffarpur- sursand400 KV

    Lorem Ipsum is simply dummy text of the printing and typesetting industry. Lorem Ipsum has been the industry's standard dummy text ever since the 1500s, when an unknown printer took a galley of type and scrambled it to make a type specimen book. It has survived not only five centuries.